In July we hired an Geo Engineering to test the soil in the detention pond on 105th along the south side. This pond is having a very serious erosion problem. in Feb-march we met with 5 contractors to fix this issues. They all suggested a wall would be the best way to fix it. We did run in to the issues that they would not give us a bid not less we had a geo study done. A geo study was needed to determine where the stable soil was, wall height and recommended best way to fix it.
The Report states that the erosion is causing Damage to the residential property adjacent.
"This report (including any enclosures and attachments) has been prepared for the exclusive use and benefit of the addressee(s) and solely for the purpose for which it is provided. Unless we provide express prior written consent, no part of this report should be reproduced, distributed or communicated to any third party. We do not accept any liability if this report is used for an alternative purpose from which it is intended, nor to any third party in respect of this report."